
Pampa Energía has submitted its application to build an oil and gas treatment plant at its Rincón de Aranda field, Argentina, with an investment of US$426 million. With its start up scheduled for 2026, Pampa will export crude oil worth the equivalent of $1.2 billion starting in 2027. The project includes the design, construction, and operation of a central processing facility (CPF) that will allow for the processing, storage, and transportation of oil and natural gas. The construction of this plant and its associated infrastructure is key to strengthening operations in Vaca Muerta.
SOURCE: HYDROCARBON ENGINEERING